Methods of determining construction costs added to Circular 05/2007/TT-BXD⛔ include: Methods of determining construction costs according to the volume and unit price of full construction of works (attached to detailed guidance in Appendix 1); The method of determining construction costs according to the total volume of wasted materials, labor, construction machines and the corresponding price list (detailed guidance in Appendix 2); The method of determining construction costs is based on the construction cost rate in the investment capital rate or on the basis of works with similar economic-technical indicators already implemented (detailed guidance in Appendix 3). The Circular takes effect 15 days after publication in the Official Gazette