Renewing the technical process of operating the remote sensing data receiving station
Circular No. 68/2025/TT-BNNMT dated November 28, 2025 of the Ministry of Agriculture and Environment regulating technical regulations for operating infrastructure works to collect remote sensing data (26 pages)
Posted: 5/12/2025 9:28:38 AM | Latest updated: 7/12/2025 5:15:50 PM (GMT+7)
Effective: 15-Jan-2026
Status: No amendments
• Subjects of application of the Circular: This Circular directly affects state agencies, organizations and individuals assigned to operate and maintain infrastructure works for collecting remote sensing data. (Article 2)
◦ Requirements for infrastructure works: Data receiving stations and satellite control stations must ensure the ability to communicate with satellites, receive and transmit stable signals, and data quality must meet the prescribed standards. The installation location must be airy, equipped with infrared cameras for monitoring and have a safety belt. (Article 4)
◦ Working environment and power supply system: The equipment must operate stably in harsh weather conditions. The equipment installation room must be dry, have suitable humidity and temperature. The stations must be equipped with fire prevention and lightning protection systems. There must be a backup power supply system (stable power source, power backup system for at least 30 minutes, generator automatically activated after 1 minute) to maintain operation when the grid power is lost. (Article 5, 6)
◦ Network system and operating conditions: Control and data collection stations must be connected to each other, ensuring network security and the ability to prevent attacks. The system must operate continuously 24/7 (except in cases of force majeure). Technical operators must have a university degree or higher and at least 01 year of practical experience. (Article 7, 8)
◦ Requirements for shifts: The number of technical staff must be appropriate to the characteristics of each station (minimum 06 people for each type of station), ensuring monitoring and control/data collection. Work results and incidents must be recorded in the shift log and handed over between shifts. (Article 9)
◦ Technical regulations for satellite control station operation: Including mission planning, pre-session preparation, session monitoring, post-session processing, reporting of results, emergency operation, coordination with data receiving stations, troubleshooting, system maintenance, quality assessment and sensor calibration. (Article 10-19)
◦ Technical regulations for operating data receiving stations: Including making scanning requests, preparing before the session, monitoring during the session, processing after the session, storing and backing up data, monitoring and evaluating results, reporting results, processing data to a higher level, operating in emergency mode, coordinating with satellite control stations, ensuring data information security, handling technical problems and maintaining the system. (Article 20-32)
◦ Responsibility for ensuring information and data security: Agencies and units must apply measures to ensure security and protect remote sensing data according to the provisions of law. Technical staff must comply with regulations on information security and data security. (Article 30)
This Circular takes effect from January 15, 2026 and replaces Circular No. 39/2015/TT-BTNMT⛔ dated July 9, 2015.
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |
